Double Stud Wood Frame with Siding
Flanged & Centered Window
R-45 Wall
Head
(Detail 1/3)
Sill
(Detail 2/3)
Jamb
(Detail 3/3)
Notes
This window detail uses a two stage seal to insure no water or air can infiltrate into the building. The exterior seal is installed by applying WRB tape into the rough opening and over the head window flange. No tape should be applied over the sill window flange to allow the window to drain.
The interior seal is added by installing a backer rod & sealant joint. Expanding foam or special tapes can be used instead of sealant, however a backer rod should still be installed to prevent the foam from completely filling up the cavity and preventing the system to drain.
* Whether or not you need a Class II or III Vapor Barrier depends on your climate zone and location. Refer to Wall Barriers Notes section below for more info.
Building Science Courses on Acelab
Adapt this detail & find the right products
Learn how you can adapt this detail based on your climate zone & desired aesthetic
Wall Barriers
Understand how climate affects wall specifications, learn whether you should use a vapor retarder, & discover suitable products.
Climate Zone
Design Requirements
Notes
Product Options
Browse curated materials for this construction detail.

